I'm collecting golden fingers from all over the world - Chapter 971
c35 The problem of waste electricity (this chapter is water)
When senior officials were still doubting whether Wu Siyuan was a hidden [witch], Wu Siyuan was heading to the Tengger Desert in Xinjiang Province to inspect new projects.
[Chaoqun Group] has invested tens of billions of funds to carry out three-dimensional development in the Tengger Desert, from the photovoltaic industrial park to provide energy, to the Danhua water plant to provide water resources, and the supporting oil melon biological layoffs industrial park to provide Economic benefits, combined with cattle and sheep breeding and supporting related industries.
Today, the Tengger Desert has achieved sustainable and cyclical development and truly has the ability to create its own blood. It provides nearly 100,000 jobs, dozens of pocket towns have been established throughout the desert, and a larger number of characteristic administrative departments. The village has driven significant economic development, transforming it from a place that requires a large amount of money to maintain every year to a new oasis with an annual output of at least several billion, and has become a model for desert management.
Every year, many important leaders and distinguished foreign guests come to inspect and deliver important speeches.
However, these situations are not Wu Siyuan’s focus.
Wu Siyuan is concerned about photovoltaic industry projects.
After the success of the Tengger Desert project, many desert areas began to imitate the success of the Tengger Desert and introduced many photovoltaic industrial parks.
Coupled with the more efficient photovoltaic power generation technology Wu Siyuan obtained from the [Mars Rescue] project – [Chaoqun Group] did not directly enter the photovoltaic industry. It only provided key parts to domestic photovoltaic companies, which has already made these photovoltaic companies Global trade has wiped out other countries.
The advantage was already huge, but now it is even more unstoppable.
This trillion-level photovoltaic industry does not mean that a large piece of the cake will be eaten by the country, but that the entire cake will be taken away by the country.
However, [Chaoqun Group] has only issued a restriction order. Any photovoltaic company that transfers production capacity to other countries will not receive key parts supply and technical support from [Chaoqun Group].
In an instant, all domestic photovoltaic companies ceased operations.
So Baitouqi finally discovered that the clown turned out to be me, and the increased tariffs were transferred to my own family.
In the photovoltaic industry, [Chaoqun Group] is the real king!
A restriction order will allow the photovoltaic industry across the country to act in a unified manner.
The influence is truly incredible.
But having said that, [Chaoqun Group] really controls a lot of industries, so it’s no wonder that so many people are worried about it.
Of course, this is not the point.
The point is, the domestic photovoltaic industry is not only decimated abroad, but also at home.
The same is true for photovoltaic industrial parks.
Photovoltaic industrial parks with huge investment are rising in various places.
With the announcement of [Magnetic Field Resonance Wireless Charging Technology] by [Chaoqun Group], although [Chaoqun Group] has repeatedly stated that this technology is not yet mature, it has triggered an investment boom in photovoltaic industrial parks among many people in China.
Because once [Chaoqun Group]’s [Magnetic Field Resonance Wireless Charging Technology] matures and can be commercialized, the photovoltaic industrial park will become as valuable as an oil well.
Maybe they won’t be able to eat the sweetest piece of cake in this comprehensive [oil-to-electricity] revolution, but there is no problem in getting a piece of the pie.
However, all this is based on the mature implementation of [Chaoqun Group]’s [Magnetic Field Resonance Wireless Charging Technology].
But something went wrong with the research.
This technology was actually obtained by Wu Siyuan from the world of [Doraemon·Cloud Kingdom], and the technology is very mature.
But the application scenario of this technology is on the cloud continent in the sky.
The sky is unobstructed, and the continent of clouds can drift around the world.
Therefore, there is no problem with [Magnetic Field Resonance Wireless Charging Technology] and it can smoothly supply energy to all Cloud Continents in the sky.
But when Wu Siyuan put this technology into reality, the situation was different.
Due to technical limitations, Wu Siyuan cannot apply this technology in the sky and can only build those base stations on the ground.
The situation has become very complicated due to the influence of various factors such as terrain and safety.
It’s not a big problem in plain areas.
In mountainous areas, the effect of [magnetic field resonance wireless charging technology] is not very ideal.
Of course, the application problem in most cities is still not big.
Mainly it’s an issue with [electric transportation].
After all, one of the most important aspects of this technology is to replace ultra-high voltage wires and transmit electricity generated from new energy sources to remote areas at ultra-low cost.
It happened that problems arose in this area, which led to the fact that this technology has been launched by [Chaoqun Group] for a long time, but it has been unable to be commercialized.
Of course, there are other reasons.
But this reason is the most critical.
Good thing.
This problem was solved after Wu Siyuan went to the world of [Tianmo Shentan].
Wu Siyuan’s men were inspired by the unique energy stone structure in the world of [Tianmo Shentan], and finally developed this excellent energy storage battery.
It has two main functions.
The first role is to serve as a transfer base in places where [magnetic resonance wireless charging technology] is not well applied, such as mountains, rivers and other places that are greatly affected by terrain, so as to transport electricity.
The second function is to allow new energy sources, such as waste electricity, which are disliked by the power grid, to really have a use.
Why is the State Grid unwilling to use new energy sources such as photovoltaic power?
Because photovoltaic power is originally DC power, and the power frequency of the State Grid is the standard 50 Hz AC power, photovoltaic power must use an inverter to convert low-voltage DC power into 50 Hz high-voltage AC power to meet the requirements of the power grid.
Due to the uneven quality of inverters used in various places, it is difficult to ensure that the frequency sent to the power grid reaches 50 Hz. The power grid is a 50 Hz sine wave, and 50 Hz photovoltaic electricity can only be regarded as harmonic electricity, or what some people call “junk electricity.”
Different frequencies cannot be added directly and the power will be reduced.
In addition, the low rotational inertia of new energy power generation leads to poor adjustability, so the new power system will be more fragile, which will make it difficult to provide safe and stable power supply to the power system.
This is the dilemma of new energy power, which is not favored by the power grid.